- Posted using BlogPress from my iPad
Monday, July 22, 2013
Thursday, July 18, 2013
Sunday, July 14, 2013
Must be time for new construction!!
With all the sewer issues we have had we knew we were looking at some major plumbing fixes. We had decided we needed to remodel the kids bathroom since they needed a shower and each time something backed up it came out into their bathroom.
here are the before pics!
cabinets falling apart |
cool looking accessible shower, that did not drain and was not waterproofed :( |
big ole tub - kids loved it but it held lots of water and it got cold too fast :( |
the kids were so excited when the dumpster was dropped off! |
old garage doors - wood with NO insulation |
New garage doors - WITH insulating value! |
everything in place! |
found two holes in the floor, from previous toilets, not plugged |
bye bye big tub! |
I was thinking of planting some flowers :) |
the plumbing they found - oye! |
yes, that is the garage you can see through the floor! but yippy for new pipes!! :) and our plumber actually uses glue! :) |
Friday, July 5, 2013
Graduation from Sheriff's Safety Camp!
Danny and Gerri had a week long safety camp and Today was graduation day!
police chief, fire chief, mayor, county sheriff :) |
the Cadets file in! |
Danny's whole group |
Gerri's group
We went and saw Monster's University after and it was so good!
which totally tweaked Ms G :( so Danny was good about hanging with her "the big kids" :)
Thursday, July 4, 2013
Happy Fourth!!
Subscribe to:
Posts (Atom)